PROJECT DESCRIPTION

Located at the south end of Boeing Field, the Charles Air Hangar consists of a 32,000 sf hangar and 12,000 sf adjacent support building. Seneca Group managed master planning, design, permitting, and construction. The hangar features a continuous clerestory ribbon window giving the impression that the roof floats above the hangar space. A waiting lounge, conference space, and offices are housed in a metal insulated panel, reclaimed wood and glass volume that breaks down the scale and industrial feel of the hangar. This project received LEED silver certification.

CLIENT
  • Private Corporate Client
LOCATION
  • Seattle, WA
PROJECT SIZE
  • 44,000 SF
COMPLETION DATE
  • 2013
SCOPE OF WORK
  • Permits and approvals
  • Architect and contractor selection and contract negotiations
  • Design and construction management
  • Scheduling
  • Budget and cost control
  • Furniture, fixtures and equipment coordination
  • Move-in assistance
TEAM
  • Seneca Group - Development Manager
  • Lease Crutcher Lewis - General Contractor
  • ORA - Architect